Description: Afyonkarahisar – Uşak (Banaz) High Speed Train Project – Infrastructure and Bridge Construction – Direct Crossing Line Between Km 151+500 And Km 231+000 – Bridge Construction Works
Employer: Doğuş İnşaat A.Ş. and Tekfen İnşaat A.Ş. Joint Venture
Year: 2018
Place of Construction: Afyon
Production(Type Of Forms): Climbing Form
Reinforcement (Tons): 4000
Concrete (M3): 13.800
Current State: In Progress